C3

Action C3: Assets Supervision and containment of invasive alien species at the structures built in Isola Serafini .


START: 1/01/2017 - END: 30/06/2018             


The collection system is an integral part of the passageway for fish, located inside the hydroelectric power station, and is fully functional.

Log-in





Il sito è realizzato con il contributo dello strumento finanziario LIFE della Comunità Europea.